Scope of Contract:

  • Site Clearance and Topsoil Removal 

  • Demolition of five (5) existing bridges 

  • By-Pass Interventions include:

    • Construction of 3No. Ford Crossings 

    • Erection of 2 No. Bailey Bridges

  • Earthworks to Formation Levels 

  • Construction of five (5) Reinforced Concrete Slab Bridges 

  • Inlet and Outlet Slope and Bed Protection Works