Scope of Contract:
-
Site Clearance and Topsoil Removal
-
Demolition of five (5) existing bridges
-
By-Pass Interventions include:
-
Construction of 3No. Ford Crossings
-
Erection of 2 No. Bailey Bridges
-
-
Earthworks to Formation Levels
-
Construction of five (5) Reinforced Concrete Slab Bridges
-
Inlet and Outlet Slope and Bed Protection Works