Downloads
          
                        
                                  Download PDF
                            
                
              
          
          
                               Summary
              The contractor shall undertake the design, supply, and installation services for a solar grid-tie electrical system for the Crique Jute Village Water Supply System, Toledo District, Belize. The system is desired to be connected to the main electrical grid, along with being able to produce an estimated output of 100kWh per day to provide electricity for the water supply system, which has a total electrical demand load of approximately 22.3kVA.