Kingstown Port Modernisation Project: Lot 1 - Primary Cargo Port Design Review and Construction Supervision
Downloads
Download PDF
Summary

Summary Scope of Contract:

Consultant shall review, appraise, approve and confirm all design work submitted by Contractor thorough inspection of site and review of the detailed design documentation prepared by the Contractor (design report, construction drawings, technical specifications, design calculations, environmental management and mitigation measures and other documents deemed appropriate for the design review); ensure excellent quality control and Contract enforcement; fully responsible for the supervision of the construction; exercise the powers of the Engineer in all matters concerning the Contract and the execution of the works; undertake on-the-job training.