Natural Disaster Management - Rehabilitation and Reconstruction (Hurricane Tomas/North Windward)
Downloads
Download PDF
Summary
  • Final Coastal Engineering Design , Tender Assistance, Flood Assessment and Preliminary River Training and Urban Design (duration – 10 weeks, tentative start date July 2020).
  • Final River Training and Urban Design (duration – 6-8 weeks, tentative start date September 2020)