Natural Disaster Management - Rehabilitation and Reconstruction (Hurricane Tomas/North Windward)
Downloads
Download PDF
Summary
  • River Defense using boulder packing with concrete matrix 1,289.30ft
  • River Defense using gabion baskets (approximately 510 ft total length)
  • Outfall scour protection using boulder packing with concrete matrix (approximately 10 ft) to be installed as directed by the Engineer
  • Underpin existing rubble wall with concrete boulder matrix (approximately 225 ft) to be installed as directed by the Engineer
  • Reinforced concrete retaining wall construction (approximately 132 ft.)
  • Lined spillway ditch (approximately 115 ft.)
  • River bed protection works with graded Rip-Rap (approximately 775 CY)