Civil Works will include:
-
Replacement of the existing Burdon Canal Bridge with a new structure designed to AASHTO HL-93 standards: a two-lane, single-span, prestressed concrete girder bridge, with pedestrian walkways on both sides and scour-protection works at abutments.
-
Replacement of existing Hector Creek Bridge with a new structure designed to AASHTO HL-93 standards: a two-lane, single-span, pre-stressed concrete girder bridge, with pedestrian walkways on both sides and scour protection works at abutments.
-
Rehabilitation and upgrading of the roadway, including construction of a 7.2 m-wide carriageway with 2 m-wide hard shoulders on both sides, including a 250 mm-thick sub-base course, a 200 mm-thick base course, and a 50 mm-thick concrete wearing course, along with the construction of concrete sidewalks.
-
Construction of 16 formalized bus stops with shelters and pedestrian crossing facilities.
-
Installation and rehabilitation of culverts and associated drainage infrastructure, including slope protection.
-
Provision and installation of road safety furniture (guardrails, road studs, line marking and signage)
-
Provision and installation of solar / LED roadway lighting.
Note: Procurement Method: International Competitive Bidding (ICB).