LIBERTAD VILLAGE AND CONCEPCION VILLAGE JOINT WATER SUPPLY SYSTEM REHABILITATION, COROZAL DISTRICT, BELIZE
Downloads
Download PDF
Summary

The contract includes for the supply and installation of all requisite materials, equipment, and relevant appurtenances for approximately 41,000 feet of polyvinyl chloride (PVC) transmission and distribution lines; installation of approximately 750 service connections; construction of pumping facilities; and the installation of all requisite electrical works.  Works will also include for the rehabilitation of an existing chain link perimeter fence, which will cordon the pumping facilities.