DESIGN, SUPPLY, AND INSTALLATION OF A SOLAR GRID-TIE ELECTRICAL SYSTEM FOR THE CRIQUE JUTE VILLAGE WATER SUPPLY SYSTEM, TOLEDO DISTRICT, BELIZE
Downloads
Download PDF
Summary

The contractor shall undertake the design, supply, and installation services for a solar grid-tie electrical system for the Crique Jute Village Water Supply System, Toledo District, Belize.  The system is desired to be connected to the main electrical grid, along with being able to produce an estimated output of 100kWh per day to provide electricity for the water supply system, which has a total electrical demand load of approximately 22.3kVA.