Montserrat Port Development Project - Design and Construction of Physical Infrastructure
Downloads
Download
Summary

Summary Scope of Contract:

Construction of a 130 m long by 20 m wide pier, 23 m wide RoRo ramp and a mooring dolphin.

  • Construction of a filled causeway and roadway to access the pier and RoRo ramp and coastal protection 
  • Drainage and lighting for the pier, RoRo ramp and roadway.
  • Dredging of the harbour basin and construction of seaward coastal protection.
  • Fender upgrades at the port’s existing pier and landside slope stabilisation.  
  • Geotechnical investigations and design of all of the above works.