Sixth Power Project - Belize
Downloads
Download PDF
Summary

Supply of three-(3) banks of three-(3) Voltage Regulators with CL7 Multiphase Control and one-(1) CL7 Multiphase Control (spare control) for the new Belize City Substation Project, under the Belize City Upgrade; Sixth Power Project (Belize).