| Project Name | Sectors & Themes | Country | Type | Winning Bid |
|---|---|---|---|---|
| Completion of Detailed Final Designs of Cul De Sac Roundabout | Infrastructure | Saint Lucia | Consultancy | St. Lucia Theobalds Consulting Ltd. US$ 75,000 |
| Lot 1- Settlement Upgrading Project Construction of Residential Accesses, Drains and Footpaths | Infrastructure | Saint Lucia | Works | St. Lucia- Construction and Industrial Equipment Limited XCD 1,915,923.77 |
| Lot 2- Settlement Upgrading Project Construction of Residential Accesses, Drains and Footpaths | Infrastructure | Saint Lucia | Works | St. Lucia- Phoenix Construction Company Limited XCD 1,743,722.05 |
| Lot 3- Settlement Upgrading Project Construction of Residential Accesses, Drains and Footpaths | Infrastructure | Saint Lucia | Works | St. Lucia- Construction and Industrial Equipment Limited XCD 2,357,114.05 |
| SOLAR HYBRID PLANT CORONIE AND NIKERIE | Climate | Suriname | Works | China - Sumec, Complete Equipment & Engineering Co.,Ltd. US$8, 306,324 |
| STREET LIGHTING RETROFIT AND ADVANCED METERING INFRASTRUCTURE PROJECT | Climate | Suriname | Consultancy | Canada - Golder Associates LTD. US$ 39,480 |
| FEASIBILITY STUDY AND PREPARING DETAILED DESIGNS FOR THE UPGRADE OF THE LETHEM AERODROME | Transportation | Guyana | Consultancy | Guyana & Trinidad - CEMCO Inc. in association with C&H Associates Limited US$ 976,700.00 |
| Feasibility study, and prepare detailed designs, drawings, cost estimates and bid documents for the construction of a bridge at Wismar, Linden | Transportation | Guyana | Consultancy | Italy- Politecnica Ingegneria ed Architettura Società Cooperativa US$700,000.00 |
| Lot 4 Works site 8: N 78 Village to Line Path, Corentyne | Transportation | Guyana | Works | Guyana- B K International Inc. US$4,760,512.90 |
| Lot 5 Works site 4: Grove/lookout, East Bank Essequibo | Transportation | Guyana | Works | Guyana- B K International Inc. US$2,030,933.85 |