| Projectnaam |
Sector |
Land |
Type |
Winnende bod |
| Santa Elena/San Ignacio By-pass Project
|
Transportation
|
Belize
|
Works
|
Cisco Construction Ltd.
BZD 5,449,401.60
|
| Electrical Engineering Consultancy Services for the Electricity System Upgrade and Expansion Project
|
Climate
|
Suriname
|
Consultancy
|
Fichtner GmbH & Co. KG
USD 2,218,400.00
|
| Updating of a Feasibility Study and the Preparation of Detailed Designs for the Upgrading of the Coastal Highway – Belize
|
|
Belize
|
Consultancy
|
Politecnica Ingeneria Ed Architettura Societa Cooperativa
USD 995,000.00
|
| Road Infrastructure Rehabilitation Project
|
Transportation
|
Antigua and Barbuda
|
Works
|
Bahamas Hot Mix Co. Ltd.
USD 14,992,213.06
|
| Baseline Survey for “Building Adaptive Capacity and Resilience to Climate Change in Toledo” Project in Belize
|
Climate
|
Belize
|
Consultancy
|
Consortium Equal Chance @ Green Development and Praxis5
USD 72,735.00
|
| Road User Education and Awareness Component- Road Safety Project– Belize
|
Transportation
|
Belize
|
Consultancy
|
Ignite Limited
BZD 109,435.00
|
| Design and Delivery of Online and Face-to-Face Public Policy Analysis and Management Training
|
Institutions
|
Regional
|
Consultancy
|
Dods Training (Westminster Explained)
USD 804,250
|
| Monitoring & Evaluation of Public Policy Analysis and Management (PPAM) and Project Cycle Management (PCM) Training Project
|
Institutions
|
Regional
|
Consultancy
|
MindBloom Consulting
USD 187,000.00
|
| Mid-Term Evaluation of the Community Disaster Risk Reduction Fund (CDRRF) Project
|
Climate
|
Regional
|
Consultancy
|
Universalia Management Group Ltd.
USD 59,819.00
|
| Equipment for Materials Laboratory for Road Infrastructure Rehabilitation Project
|
Transportation
|
Antigua and Barbuda
|
Goods
|
Sotex International Ltd
USD $122,029.48
|