This evaluation examines the Caribbean Development Bank’s (CDB) Country Engagement Strategy (CES) for Saint Lucia for the period 2020–23, including activities designed and implemented until December 2024. The evaluation uses a mixed-methods approach, combining document reviews, portfolio analysis, and stakeholder interviews, to inform the next CES. The evaluation process supported participation, reflection, and co-creation. During the inception phase, feedback was collected from CDB staff and Government of Saint Lucia (GOSL) counterparts to refine the focus and ensure evaluation questions would generate insights aligned with both CDB’s strategic needs and GOSL priorities. A Theory of Change workshop was conducted with CDB and GOSL stakeholders to reconstruct the underlying logic of the CES and identify key assumptions and change pathways. This collaboration provided a shared foundation for assessing progress and strategic alignment. Validation of emerging findings was carried out via an online workshop. A hybrid co-creation workshop was held with Saint Lucia-based stakeholders and CDB staff to collaboratively develop recommendations and ensure proposed actions are useful, specific, and actionable, with the aim of increasing the success of the next CES.
Second Water Project - Belize (2018)
Water Resource Management
Project Completion Validation Report
Complete
Belize
Summary
In December 1997, the Caribbean Development Bank (CDB) approved a loan in the amount of USD13.83 million (mn) to the Government of Belize (GOBZ) to assist in financing the Second Water Project - Belize. This was the second project and the fifth loan provided to GOBZ, by the Caribbean Development Bank (CDB), in the Water and Sewerage sector. The loan was to finance approximately 79% of the estimated project costs of $34.95 mn (USD17.47 mn). The funds were to be utilised for: upgrading of intake works and a water treatment plant; supply and installation of a transmission main; upgrading of two re-lift pump stations; expansion of a distribution network; non-revenue water reduction measures (including the installation of new or recalibration of existing bulk flow meters); and upgrading of the computerised billing and accounting system. The GOBZ and the Water and Sewerage Authority (WASA) were to provide counterpart funding of $0.44 mn (USD0.22 mn) and $6.85 mn (USD3.42 mn) respectively, to meet the remaining project costs.