| Project Name | Sectors & Themes | Country | Type | Winning Bid | 
|---|---|---|---|---|
| Feasibility study, and prepare detailed designs, drawings, cost estimates and bid documents for the construction of a bridge at Wismar, Linden | Transportation | Guyana | Consultancy |                 Italy- Politecnica Ingegneria ed Architettura Società Cooperativa  US$700,000.00  | 
              
| Lot 4 Works site 8: N 78 Village to Line Path, Corentyne | Transportation | Guyana | Works |                 Guyana- B K International Inc.  US$4,760,512.90  | 
              
| Lot 5 Works site 4: Grove/lookout, East Bank Essequibo | Transportation | Guyana | Works |                 Guyana- B K International Inc.  US$2,030,933.85  | 
              
| AIRPORT AIRFIELD AND GROUND SIDE PAVEMENT IMPROVEMENTS AND REHABILITATION | Construction | Barbados | Works |                 Barbados/ Canada JADA Builders Inc./Dexter Construction Company Limited   US$44,687,568.49  | 
              
| Design and Supervision of Infrastructure Works for the Crique Jute Village Rudimentary Water System Sub-project | Construction | Belize | Consultancy |                 Belize- Mitchell-Moody Associates with Keith Hardwick and Tunich-Nah Consultants & Engineering  BZD $170,977.50  | 
              
| Design and Supervision of Infrastructure Works for the San Jose Village – San Pablo Village Joint Rudimentary Water Systems Sub-projects | Construction | Belize | Consultancy |                 Belize- : Mitchell-Moody Associates with Keith Hardwick and Tunich-Nah Consultants & Engineering  BZD $149,180.63  | 
              
| BEPII Expansion and Rehabilitation of Sir McChesney George Secondary School | Construction | Antigua and Barbuda | Works |                 Antigua- Harrigan Building Construction  USD 3,271,781.93  | 
              
| RRL Expansion and Rehabilitation of Sir McChesney George Secondary School | Construction | Antigua and Barbuda | Works |                 Antigua- Harrigan Building Construction  USD 3,414,368.89  | 
              
| FEASIBILITY STUDY AND PREPARING DETAILED DESIGNS FOR THE CONSTRUCTION OF A NEW STELLING AT PARIKA | Construction | Guyana | Consultancy |                 Antigua/Guyana- Mott MacDonald in association with SRKN’gineering  GBP $610,455.80  | 
              
| Design and Supervision of Infrastructure Works for the St. Michael’s RC Primary School | Construction | Belize | Consultancy |                 Belize- Young’s Engineering Consultancy Ltd.  BZD $180,504.00  |