Electricity System Upgrade and Expansion Project - Lot Substations Contract - CDB-930-012
Downloads
Download
Summary

The overall Scope of Works can be summarised as follows:

The supply and installation of 110 kV, 33 kV, 12.3 kV and 6.15 kV Substations Paramaribo which include:

  • New Substation Leiding (110/12.3 kV)
  • New Substation D2 (110/33 kV)
  • New Substation AZ (33/6.15 kV)
  • New Substation Ringweg (110/12.3 kV)
  • Expansion of Substation E (110/33 kV)
  • Expansion of Substation J (110/33 kV)

33 kV Transmission Lines Paramaribo which include:

  • S/S D - S/S D2 (33 kV cable)
  • Loop in Loop out to S/S AZ (33 kV cable)

33 kV and 12.3 kV Substations Nickerie which include:

  • New Substation Clara (12.3/33 kV)
  • New Substation van Pettenpolder (33/12.3 kV)

Besides the specified main equipment, it will be necessary to include all other related equipment, and ancillary facilities as will be necessary in the manner, to the specified standards, within the time and within the price agreed as outlined in the schedule of requirements and the technical requirements and in accordance with the procedures, conditions and contract terms prescribed in the Tender documents.